THE TRINITY CLOCK

 

 
 

Data

From to [ Shift -1 day | Shift +1 day ] Zoom menu

Plot and as with

Comments (see all | edit)

29 Dec 2009 [08:45]
pigeon caused 75 second stoppage [link], corrected on 5 Jan.

Download data

Interval between data points: seconds [either 3 seconds (weather data is duplicated) or multiples of 60 seconds (all data is averaged)].

[Raw data: Clock | Weather]


Contact: clockkeeper@trin.cam.ac.uk, Trinity College, Cambridge