THE TRINITY CLOCK

 

 
 

Data

From to [ Shift -1 day | Shift +1 day ] Zoom menu

Plot and as with

Best fit to data (blue line). Reference gradient (red lines):-583ms/day/mrad.
Going will vary with amplitude because sin(θ) ≉ θ

Comments (see all | edit)

06 May 2009 [09:00]
the spider again? Things settle down well after this - back to normal and very good running.

Download data

Interval between data points: seconds [either 3 seconds (weather data is duplicated) or multiples of 60 seconds (all data is averaged)].


Contact: clockkeeper@trin.cam.ac.uk, Trinity College, Cambridge