THE TRINITY CLOCK

 

 
 

Data

From to [ Shift -1 day | Shift +1 day ] Zoom menu

Plot and as with

Comments (see all | edit)

29 Dec 2018 [12:06]
repositioned the orange Wyler level - it had fallen off it's magnetic supports - again! I glued the magnets on more carefully - with balsa cement. In doing so Iknocked the E-W vial which I re-leveled, repositioned and rotated. It too seems to be migrating. The other two vials seem to be OK on level, but rotating. I re-oriented them all and put some balsa cement on each of the vials.
29 Dec 2018 [12:05]
winding
29 Dec 2018 [12:00]
GCR=50.01s on lower layer

Download data

Interval between data points: seconds [either 3 seconds (weather data is duplicated) or multiples of 60 seconds (all data is averaged)].

[Raw data: Clock | Weather]


Contact: clockkeeper@trin.cam.ac.uk, Trinity College, Cambridge